Shelter Neck Recovery
  • Home
  • Donate
  • Recovery News
  • About Shelter Neck
  • Contact

Work Day October 13

10/13/2018

1 Comment

 
Wow!  Lots was accomplished this Saturday:
Walls uncovered in parlor to ceiling,  except for foam insulation board.
Lower walls uncovered in Dining Room
Lower walls uncovered in Hallways
Furniture mostly cleared out except that being used for work
Shelves in hall removed
Bathroom counter, toilet stall partitions, and cabinets removed
Most of lower walls removed in large bathroom,
Holes opened up in almost all Dix first floor walls for air circulation
Bedrooms cleared out
Pantry cleared out
Chapel Pulpit removed for restoration
Dishes taken for cleaning or stored on deck (I think)
Most plaster carried out to woods for disposal
Wallboard, paneling, and furniture carried to roadside
Picture
Picture
1 Comment
susan wasilewski
10/21/2018 05:43:25 am

Thank you to Billy Liles for adopting the treasured chapel pulpit podium to restore!

Thank you to Jane Hunt for adopting kitchen equipment not affected by the flood to sanitize and store!

Thank you to the Chris Wilkes Family and the James Duncan Saunders Family for adopting curtains, lamps and other items to clean, restore and store that were not affected by the flood!

Thank you to the Andy Wasilewski Family for cleaning and dry cleaning curtains and bedding stored prior to the flood for safety to prepare for the refurbishing day after restoration and many historic photos for preserving and storing in a climate controlled storage unit!

Reply



Leave a Reply.

    Archives

    November 2018
    October 2018
    September 2018

    RSS Feed

Powered by Create your own unique website with customizable templates.
  • Home
  • Donate
  • Recovery News
  • About Shelter Neck
  • Contact